December 23, 2016
The amendments help you meet the new energy efficiency requirements for buildings that come into effect, January 1, 2017.
Amendments apply to large buildings constructed under the requirements of Part 3 and non-residential buildings covered under the requirements of Part 9 of Division B of the Building Code.
Amendments include the following (Divisions 3 and 5 of this standard):
Division 3 and 5 changes will apply to construction for which a permit has been applied for after December 31, 2016.
However, construction for which a permit is applied for between January 1, 2017 and December 31, 2017 is permitted to comply with Division 3 and Division 5 as it currently reads (i.e. as it reads before the changes described above take effect).Minor editorial changes are also made to Divisions 2 and 4.
The Minister’s Ruling and the revised Supplementary Standard SB-10 (as amended on December 22, 2016) are available here.
Le 23 décembre 2016
Les modifications vous aident à respecter les nouvelles exigences en matière d’efficacité énergétique des bâtiments qui prennent effet le 1er janvier 2017.
Les modifications s’appliquent aux grands bâtiments construits selon les exigences de la partie 3 et aux bâtiments non résidentiels visés par les exigences de la partie 9 de la division B du Code du bâtiment.
Les modifications incluent ce qui suit (divisions 3 et 5 de cette norme) :
Les modifications aux divisions 3 et 5 s’appliqueront aux travaux de construction pour lesquels une demande de permis a été déposée après le 31 décembre 2016.
Cependant, les travaux de construction pour lesquels une demande de permis est déposée entre le 1er janvier 2017 et le 31 décembre 2017 sont autorisés à se conformer aux divisions 3 et 5, telles qu’elles existent actuellement (c.-à-d. telles qu’elles existent avant que les modifications susmentionnées prennent effet).
Certaines modifications rédactionnelles mineures sont également apportées aux divisions 2 et 4.
La décision du ministre et la norme supplémentaire révisée SB-10 (dans sa version modifiée du 22 décembre 2016) sont affichées ici (en anglais seulement).
December 23, 2016
In December 2013, amendments to the Building Code were filed that introduced new fee structures for the following services:
A subsequent Building Code change affected fees for applications to the Building Materials Evaluation Commission
Fee changes are intended to help ensure that the fees more closely covered the costs of delivering these services and to promote the financial sustainability of these services under the Building Code Act, 1992.
Building Practitioner Registration, Building Code Commission, and Minister’s RulingsRegistrations for Building Practitioners
January 1, 2016 |
January 1, 2017 |
|||
PRACTITIONERS |
Transaction |
Fee |
Fee |
|
Building Officials |
Initial Registration/Reinstatement |
$107 |
$109 |
|
Annual Renewal |
$107 |
$109 |
||
Independent Designers |
Initial Registration/Reinstatement |
$107 |
$109 |
|
Annual Renewal |
$107 |
$109 |
||
Design Firms |
Initial Registration/Reinstatement |
$169 |
$173 |
|
Annual Renewal |
$128 |
$131 |
||
Updating class of registration |
$36 |
$37 |
||
Septic System Installers |
Initial Registration/Reinstatement |
$107 |
$109 |
|
Annual Renewal |
$107 |
$109 |
||
Registered Code Agencies |
Initial Registration/Reinstatement |
$404 |
$412 |
|
Annual Renewal |
$297 |
$304 |
||
Updating class of registration |
$67 |
$70 |
Applications to the Building Code Commission
|
January 1, 2016 |
January 1, 2017 |
Building Code Commission |
$177 |
$181 |
Applications for Minister’s Rulings
|
January 1, 2016 |
January 1, 2017 |
Minister’s Ruling |
$582 |
$595 |
Building Materials Evaluation Commission
Applications to the Building Materials Evaluation Commission
2015 |
2016
|
2017 |
2018 and subsequent calendar
years |
$5000 |
$7,000 |
$9,000 |
$11,000 |
Le 23 décembre 2016
Les modifications au Code du bâtiment déposées en décembre 2013 ont introduit de nouvelles structures tarifaires pour les services suivants :
Les modifications au Code du bâtiment également affecté demandes auprès de la Commission d'évaluation des matériaux de construction
Ces modifications visent à assurer une meilleure harmonisation des droits avec le coût de la prestation de ces services et à promouvoir la viabilité financière des services aux termes de la Loi de 1992 sur le code du bâtiment.
Inscription des professionnels du bâtiment, Commission du Code du bâtiment et décisions ministérielles
Pour ces services, les droits sont calculés chaque année et prennent effet le 1er janvier de chaque année. Les nouveaux montants des droits sont basés sur l’Indice des prix à la consommation. Pour 2017, les droits augmenteront de 2,3 pour cent. Le tableau ci-dessous indique les droits actuels et les nouveaux droits.
Inscription des professionnels du bâtiment
1er janvier
2016 |
1er janvier 2017 |
|||
PROFESSIONNELS |
Transaction |
Droits |
Droits |
|
Responsable du bâtiment |
Inscription initiale/Renouvellement |
107 $ |
109 $ |
|
Renouvellement annuel |
107 $ |
109 $ |
||
Concepteur indépendant |
Inscription initiale/Renouvellement |
107 $ |
109 $ |
|
Renouvellement annuel |
107 $ |
109 $ |
||
Cabinet de conception |
Inscription initiale/Renouvellement |
169 $ |
173 $ |
|
Renouvellement annuel |
128 $ |
131 $ |
||
Mise à jour de la catégorie
d’inscription |
36 $ |
37 $ |
||
Installateur de systèmes
d’égouts sur place |
Inscription initiale/Renouvellement |
107 $ |
109 $ |
|
Renouvellement annuel |
107 $ |
109 $ |
||
Organisme inscrit d’exécution du
code |
Inscription initiale/Renouvellement |
404 $ |
412 $ |
|
Renouvellement annuel |
297 $ |
304 $ |
||
Mise à jour de la catégorie
d’inscription |
67 $ |
70 $ |
Demandes auprès de la Commission du code du bâtiment
|
1er janvier
2016 |
1er janvier 2017 |
Commission du Code du bâtiment |
177 $ |
181 $ |
Demandes de décisions ministérielles
|
1er janvier
2016 |
1er janvier 2017 |
Décision du ministre |
582 $ |
595 $ |
Commission d’évaluation des matériaux de construction
Pour les
demandes auprès de la Commission d’évaluation des matériaux de
construction, le Code du bâtiment prescrit les droits suivants :
Demandes auprès de la Commission d’évaluation des matériaux de construction
2015 |
2016
|
2017 |
2018 et années civiles suivantes |
5 000 $ |
7 000 $ |
9 000 $ |
11 000 $ |
November 4, 2016
The printer- friendly document is available on the ministry’s website Building Code website along with the phase one consultation documents. The index allows you to view and print all the proposed changes from one document.
The phase one consultation documents have also been posted on the Regulatory Registry and Environmental Registry.
Please submit your comments and feedback by December 20, 2016 when the consultation period ends.
We look forward to your feedback on the potential changes to the Building Code.
4 novembre 2016
À la demande d’intervenants, le ministère des Affaires municipales a mis au point un index général (en anglais seulement) de toutes les modifications proposées au Code du bâtiment de l’Ontario qui font partie de la première phase de la consultation sur le Code du bâtiment annoncée le 21 octobre 2016.
Ce document imprimable est affiché sur le site Web du Code du bâtiment avec les autres documents de la première phase de la consultation. Cet index vous permet d’afficher et d’imprimer toutes les modifications proposées à partir d’un même document.
Les documents de la première phase de la consultation sont aussi affichés sur le Registre de la réglementation et sur le Registre environnemental.
Veuillez soumettre vos commentaires et suggestions avant le 20 décembre 2016, date à laquelle la première phase de la consultation prend fin.
Nous vous encourageons à nous faire part de votre point de vue sur les modifications envisagées au Code du bâtiment.
October 21, 2016
The Ministry of Municipal Affairs is seeking stakeholder and public input on proposed changes to Ontario’s Building Code. Public consultation is an important part of developing legislation and regulation in Ontario.
This consultation will be conducted in two phases:We look forward to your feedback on the potential changes to the Building Code.
21 octobre 2016
Le ministère des Affaires municipales sollicite les commentaires des parties prenantes et membres du public à propos des changements proposés au Code du bâtiment. Les consultations publiques font partie intégrante du processus d’élaboration des lois et règlements de l’Ontario.
Cette consultation comprendra deux volets :Nous serons heureux de connaître vos commentaires sur les changements éventuels au Code du bâtiment.
July 7, 2016
Chapter 3 changes will apply to construction for which a permit has been applied for after December 31, 2016.
There have only been minor editorial changes included in this update for Chapter 2 which will continue to apply to construction for which a permit has been applied for before January 1, 2017.
The revised Supplementary Standard SB-12 (as amended on July 7, 2016) is available here.
7 juillet 2016
Les modifications au chapitre 3 s’appliqueront aux travaux de construction pour lesquels un permis a été déposé après le 31 décembre 2016.
Cette mise à jour inclut aussi quelques modifications rédactionnelles mineures au chapitre 2 qui continuera de s’appliquer aux travaux de construction pour lesquels un permis a été déposé avant le 1er janvier 2017.
La norme supplémentaire révisée SB-12 (dans sa version modifiée du 7 juillet 2016) est affichée ici.
May, 2016
Mai 2016